Shutdown; Alternative Installation Options; Electrical Connection From Above On Unfinished Walls; Large Cross-Section For Electrical Connection From - STIEBEL ELTRON HDB-E 13 AU Operation And Installation

Electronically controlled instantaneous water heater
Table of Contents

Advertisement

INSTALLATION

Shutdown

12. Shutdown
f Isolate all poles of the appliance from the power supply.
f
f Drain the appliance (see chapter "Installation /
f
Maintenance").

13. Alternative installation options

13.1 Electrical connection from above on unfinished
walls
f Cut open the cable grommet for the power cable.
f
f Push down the locking hook to secure the mains terminal.
f
Pull out the mains terminal.
f Reposition the mains terminal from the bottom to the top.
f
Secure the mains terminal by pushing it under the locking
hook.
10
|HDB-E AU
13.2 Large cross-section for electrical connection
from below
If you use cables with a large cross-section, you can fit the cable
grommet after the appliance has been installed.
1.
3.
f Before installing the appliance, use a screwdriver to push out
f
the cable grommet.
f Slide the cable grommet over the power cable. Use the in-
f
stallation aid supplied as part of the standard delivery. If
the cross-section is > 6 mm², enlarge the hole in the cable
grommet.
f Push the cable grommet into the back panel. Click the cable
f
grommet into place.

13.3 Water installation on unfinished walls

f Seal and screw in the twin connectors (not included in stand-
f
ard delivery).
2
1
3
3
1 Tee for cold water
2 Tee for domestic hot water
3 Cap
f Fit the water connections.
f
2.
4.
www.stiebel-eltron.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hdb-e 18 auHdb-e 27 au

Table of Contents