Operation With Preheated Water; Recommissioning; Water Heater Shutdown; Service Information - STIEBEL ELTRON DHC-E 3/3.5-1 Trend Operation And Installation Manual

Electronically controlled electric tankless water heaters
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Water heater shutdown

Hook the water heater cover into the water heater back panel
at the top rear. Pivot the cover downwards. Check that the cover
is securely seated at both top and bottom.
Secure the cover with the screw.
Remove the protective film from the front panel.
Switch on the power supply.
Ensure that the programming unit is functioning correctly.
12.3.2 Water heater handover
Explain the water heater functions to users, and familiarize
them with how it works.
Make the user aware of potential dangers, especially the risk of
scalding.
Hand over the instructions.

12.4 Operation with preheated water

The maximum inlet temperature may be limited by installing a
central thermostatic valve. Use the thermostatic valve for central
premixing, for example when operating an tankless water heater
with preheated water. For use in shower operation, the valve must
be set to a maximum of 131 °F (55 °C).

12.5 Recommissioning

Material losses
!
To ensure that the Direct Coil
aged following an interruption to the water supply, the
water heater must be restarted by taking the following
steps:
Disconnect the water heater from the power supply by
turning the connected circuit breaker.
Open and close all connected draw-off valves at least 5
times, for at least 3 minutes total, until all air has been
purged from the pipework and the water heater.
Switch the power back ON.
20
| DHC-E Trend & DHC-E Plus
heating system is not dam-
13. Water heater shutdown
Turn the connected circuit breaker too the "Off" position.
Drain the water heater (See section 15.1, "Draining the water
heater," pg. 21").

14. Service information

Connection overview/component overview
1
2
3
1 Motorized valve
2 Flow sensor
3 High limit safety cut-out, automatic reset, Klixon
4 NTC sensor
5 Pin strips for connected load and anti-scalding protection
6 Programming unit plug-in position
7 Diagnostic traffic lights
4
5
6
7
www.stiebel-eltron-usa.com

Advertisement

Table of Contents
loading

Table of Contents