Do not over tighten the F connectors (finger tight only). GUARANTEE All Whyte products are guaranteed for a period of 4 years from the date of purchase. www.whytetechnologies.com www.whytetechnologies.com...
Inputs SAT VH and HH Earth Terminal Bar be used in Standalone Mode when fi tt ed with a Whyte PSU. This will power the Multi switch as well as provide voltage to the HL & HH input ports to power an SAT &...
Whyte INSTALLATION INSTRUCTIONS Multiswitches. The Auxiliary DC Output port is active whether the Multiswitch is being Line Powered or powered directly. A 12V DC switch is available to power a Mast Head Amplifier connected to MOUNTING THE MULTISWITCH the TERR input. If a Mast Amplifier is not being used this must be left in the off position.
Page 6
See fi gure 3. Ensure that you do not exceed the bending radius of the of each LNB to be 200mA max (0.2A). Connect a suitable Whyte PSU to the Coaxial Cable being used. The Subscriber Cables may be arranged either side of the Multi switch before being terminated and connected.
Need help?
Do you have a question about the 5 Series and is the answer not in the manual?
Questions and answers