Compu-aire System 2100 Series Installation And Operation Manual page 36

Glycol cooled energy miser
Hide thumbs Also See for System 2100 Series:
Table of Contents

Advertisement

(1) Check electrical components and tighten any loose connections.
(2) Check all wiring and electrical insulators.
(3) Check contactors to ensure proper operation and contact point for wear.
(4) Check that fan motors (if applicable) are operational, ensure fan blades are tight and all
mounting bolts are tight.
(5) Check oil and refrigerant levels in the system.
(6) Ensure that the condenser surface (if applicable) is cleaned and free of dirt and debris.
(7) Check the operation of the control system. Make certain that all of the safety controls are
operational and functioning properly.
(8) Check all refrigeration piping. Make sure that all mechanical joints and flare nuts are tight.
Service Parts Availability
Genuine replacement service parts should be used whenever possible. Parts may be obtained
by contacting your local sales representative or authorized distributor. Contact us 562.945.8971
36

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the System 2100 Series and is the answer not in the manual?

This manual is also suitable for:

Cag-30 seriesCag-3034em

Table of Contents