Emerson Control Link ACC Technical Bulletin page 9

Anti-condensate controller system
Table of Contents

Advertisement

technical bulletin
Installation Instructions: Control Link ACC Anti-Condensate Controller System
Figure 13 - List of MODBUS Devices
7. Repeat Steps 5 and 6 until each Control Link ACC device has a name and address.
8. When finished, press
Locate the Control Link ACCs you set up, and look at each device's status in the Status field. You will see
one of the following messages:
•Online - The Control Link ACC is communicating normally.
•Offline - The Control Link ACC is not communicating, has not been commissioned, is not functional, or is not powered up. Ver-
ify the Control Link ACC is powered up, wired correctly, and has the proper network address, baud rate, and parity (see
"Troubleshooting Control Link ACCs and the ECT MODBUS Network" on page 18).
•Unknown - The Control Link ACC is not communicating or has not been commissioned. Verify the Control Link ACC is pow-
ered up, wired correctly, and has the proper network address, baud rate, and parity (see "Troubleshooting Control Link
ACCs and the ECT MODBUS Network" on page 18).
•No Port - No port is set up in the E2 Serial Configuration Manager to be a MODBUS port. Follow the instructions in "Set Up
Network Ports," page 7.
•Wrong FW Rev - This message is likely caused by the Control Link ACC having a firmware version older than the minimum
revision required by E2 for communication. Replace the Control Link ACC with a new controller that has the latest version
of firmware on it.
Document Part # 026-4703 Rev 8 10-JUN-2009
©2009 Emerson Climate Technologies Retail Solutions, Inc. This document may be photocopied for personal use.
Visit our website at http://www.emersonretailsolutions.com/ for the latest technical documentation and updates.
to return to the Network Setup menu, then press
- Online Status (Figure 14).
Page 9 of 18

Advertisement

Table of Contents
loading

This manual is also suitable for:

810-6101

Table of Contents