Section 2: System Installation

The reel frame has a metal loop called the "hanger". The hanger can be used to hang the
reel frame onto the well casing (as shown in Figure 2-1). The tape can then slide easily
over the side of the reel leg.
Figure 2-1 Reel frame on well casing.
If you are not able to hang the frame onto the well head, then either use the white plastic
leader guard (standard with all units), or the optional Tape Guide, to prevent the edge of
the well head from damaging the tape. Figure 2-2 is an example of the two parts.