Summary of Contents for Tsubaki Cableveyor TKP35H22
Page 1
Tsubaki Instruction Manual ® Cableveyor TKP35H22 (Formerly TKP0350) Caution: Always wear the appropriate protective gear (safety glasses, gloves, safety shoes, Construction/ etc.) when working. Nomenclature Horizontal divider Moving end Fixed end bracket bracket Vertical divider Link Delivery The Cableveyor is delivered in sections if its length exceeds the standard length (shown in number of links below).
Page 2
(Note: This will require more than one vertical divider.) Hole for horizontal divider 7 Cautions When Handling Pretension and sag may appear in the free span depending on the application. However, if selected within Tsubaki’s performance graph then there will be no problems with use. 50mm or over...
Need help?
Do you have a question about the Cableveyor TKP35H22 and is the answer not in the manual?
Questions and answers