Site Planning, Preparation, And Specifications; Srx345 Site Preparation Checklist; Table 12: Site Preparation Checklist For Srx345 Services Gateway - Juniper SRX345 Hardware Manual

Services gateway
Hide thumbs Also See for SRX345:
Table of Contents

Advertisement

CHAPTER 2
Site Planning, Preparation, and
Specifications

SRX345 Site Preparation Checklist

Copyright © 2019, Juniper Networks, Inc.
SRX345 Site Preparation Checklist on page 29
SRX345 Site Guidelines and Requirements on page 31
SRX345 Transceiver Specifications and Pinouts on page 35
Table 12 on page 29
provides a checklist of tasks you need to perform when preparing a
site for installing the SRX345 Services Gateway.
Table 12: Site Preparation Checklist for SRX345 Services Gateway Installation
Item or Task
Additional Information
Environment
Verify that
"SRX345 Services Gateway Environmental Specifications" on
environmental factors
page 31
such as temperature
and humidity do not
exceed device
tolerances.
Power
Measure the distance
"SRX345 Services Gateway Electrical Wiring Guidelines" on page 32
between the external
power sources and the
device installation site.
Locate sites for
"Connecting the SRX345 Services Gateway Grounding Cable" on
connection of system
page 46
grounding.
Calculate the power
"SRX345 Services Gateway Power Specifications and
consumption and
Requirements" on page 25
requirements.
m e d
f o r
P e r
y
e
s D
t
t e
B
a
N o
29

Advertisement

Table of Contents
loading

Table of Contents