CHAPTER 2
Site Planning, Preparation, and
Specifications
Site Preparation Checklist for the SRX300 Services Gateway
Copyright © 2019, Juniper Networks, Inc.
Site Preparation Checklist for the SRX300 Services Gateway on page 23
SRX300 Site Guidelines and Requirements on page 25
SRX300 Transceiver Specifications and Pinouts on page 30
Table 7 on page 23
provides a checklist of tasks you need to perform when preparing a
site for installing the SRX300 Services Gateway.
Table 7: Site Preparation Checklist for SRX300 Services Gateway Installation
Additional
Item or Task
Information
Environment
Verify that
"SRX300
environmental factors
Services
such as temperature
Gateway
and humidity do not
Environmental
exceed device
Specifications"
tolerances.
on page 26
Power
Measure the distance
"SRX300
between the external
Services
power sources and
Gateway
the device installation
Electrical Wiring
site.
Guidelines" on
page 26
Locate sites for
connection of system
"SRX300
grounding.
Services
Calculate the power
Gateway Power
consumption and
Specifications
requirements.
and
Requirements"
on page 22
Performed By
Date
Notes
23