Download Print this page

Kurt 3600V Series Operating Instructions Manual page 7

Vise

Advertisement

Available languages

Available languages

Proper O-Ring installation and usage
Most jobs require a tight contact between the workpiece and the
parallels (see above). This option offered by Kurt Manufacturing
Company is ideal for that. The O-Ring installation will provide for the
movement needed when working with parallels.
Note: We do not recommend using this option with step jaws.
Installation: Install the O-Ring in the movable jaw as shown above in
two places. Tighten the adjustment set screw for a .002" space under
the front face of the movable jaw, then the jaw will tighten down
during clamping and provide down movement, pulling the part onto
the supporting parallel.
Proper Chip Guard installation and usage
CAUTION:
Chip Guard stock shown above is provided to keep chips
from the nut and screw assembly and must be cut and
deburred to meet your application and safety needs.
*This Chip Guard stock should be cutoff to fill the opening
between jaw plates.
Example: Part plus 1 1/2 inches = Length of Chip Guard stock.
Note: Remove Chip Guard stock to lift vise. Corners of Chip Guard
stock if left extended as shown above could cause injury.
7
ENGLISH |
D40 Parts List

Advertisement

Chapters

loading

This manual is also suitable for:

3600v3610v3620v3630v