Testing The Me70 Operational Functionality; Assembling The Me70 Multibeam Scientific Echo Sounder To Turn It On - Simrad ME70 Instruction Manual

Hide thumbs Also See for ME70:
Table of Contents

Advertisement

Simrad ME70 Factory Acceptance Test
Testing the ME70 operational
functionality
Topics
Assembling the ME70 Multibeam scientific echo sounder to turn it on, page 24
Testing the serial interfaces on the Processor Unit, page 26
Testing the receiver channels with the BITE Matrix functionality, page 27
Testing the transmitter channels with the BITE Matrix functionality, page 29
Measuring the power supply output voltages in the Transceiver Unit, page 31
Recording raw data, page 35
Assembling the ME70 Multibeam scientific
echo sounder to turn it on
Prior to testing the ME70, the complete system must be assembled and turned on.
Prerequisites
You need the following equipment:
• All ME70 system units
• Dummyloads
• ME70 Installation Manual
• ME70 Reference Manual
Observe the cabling and assembly instructions in the ME70 Installation manual. See
the power-up procedure in the ME70 Reference Manual. A selection of basic operating
24
307958/H

Advertisement

Table of Contents
loading

Table of Contents