Firepower Clearline AKW Installation Instructions And Maintenance Manual page 15

Twin-wall chimney
Table of Contents

Advertisement

STRUCTURAL LOCKING BAND
Increases the maximum unsupported height of the flue from 1.5m to 2.5m, one
should be used on the joint below the roof support, and on each joint above the
roof, except the termination, replacing the standard locking band.
FLOOR SUPPORT BAND/GUY WIRE BRACKET
The Floor Support Band sits on top of the upper ventilated ceiling support.
The Guy Wire bracket is used where there are guy wire attachment points on
three sides, otherwise a roof brace kit should be used.
ADJUSTABLE BASE SUPPORT 50-80MM
Used for external systems supporting up to 20metres of flue. Incorporates a
200mm flue length. This part supports the chimney up to 12metres above and
8metres below. Wall bands are required at 1.5 -2.5metre intervals, as the
situation requires.
Code:02-***-054
Code:15-***-069
Code:02-***-060
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents