Assembly Instructions; Tools Required; Slide Preparation; Big Ride Assembly - S.R.Smith BIG RIDE Assembly And Installation Instructions Manual

Table of Contents

Advertisement

Tools Required

1. Ratchet handle
2. 9/16" deep socket
3. 9/16" wrench
4. Sand paper
5. ¼" Drill Bit
6. Power Drill
7. Level (Automatic Preferred

Slide Preparation

All local building codes must be observed and followed.
Applicable construction permits must be applied for by builders; S.R. Smith, LLC is not
responsible for any permitting of these slides.
Make sure to have at least two people capable of handling up to 100 lbs. to assemble the slide.
Remove all three sections of the slide from the carton and place near the desired location for the
slide.
The Big Ride is equipped with a PVC water jet. It is designed to attach to a 2" PVC pipe. No other
components of the water system are included.
Lightly sand each inside edge of the flanges and then wipe clean.

Big Ride Assembly

Make sure that you have all of the tools and hardware required for the subsequent steps before
1.
applying the Sikaflex 291 (5) to the edge. Sikaflex 291 should be spread on the section flange
about an inch below the slide runway surface. Each application of Sikaflex 291 should be
approximately five ounces, or half of the caulking tube. After applying the Sikaflex 291 to the exit
section flange, press the exit section to the middle section. The Sikaflex 291 curing time varies
depending on climate; the more heat and humidity, the quicker the Sikaflex will cure

ASSEMBLY INSTRUCTIONS

)
FIGURE B
NOTE:
BE SURE TO APPLY ANTI-SEIZE TO ALL
FASTENERS TO PREVENT GALLING.
7
.

Advertisement

Table of Contents
loading

Table of Contents