Initiation

Before the initiation a security check must be performed. Therefore use form:
First security check.
If the lift is installed by a competent, he will perform this security check. If the operator
installs the lift by himself, he has to instruct a competent to perform the security check.
The competent confirms the faultless function of the lift in the installation record and
the form for the security check and allows the lift to be used.
Please send the filled installation record to the manufacturer after installati -
on.
Changing of the installation place
If the place of installation shall be changed, the new place has to be prepared according
to the regulations of the first installation. The changing should be performed in accor-
dance with the following points:
• Position two erection trestles under the rails.
• Lower the lift until the rails are lay on the erection trestles.
• Disconnect electrical current supply from lift.
• Loosen fixing nuts of the carrying ropes on the head plate and removethem.
• Loosen traverse from runways and pull carrying ropes out of traverses.
• Loosen the plugs
• Transport lift to new installation place
• Install lift in accordance with chapter "Installation and Initiation" of the lift.
Use new dowels, The used dowels cannot be used any more.
A security check must be performed before reinitiation by a competent. Use
form "Regular security check".