9. Installation and Initiation

Installation of the lift

Regulations for the installation
• The installation of the lift is performed by trained technicians of the manufacturer
or its distribution partner. If the operator can provide trained mechanics, he can
install the lift by himself. The installation has to be done according to this
regulation.
• The standard lift must not be installed in hazardous locations or washing areas.
• An electric supply 3~/N+ PE, 400 V, 50 Hz and the main switch has to be provided.
The supply must be protected by customers (fuses). The electrical connection is
located in command column top side.
• All cable ducts have to be equipped with protective coverings to prevent accidents.

Erection and doweling of the lift

Normally a special foundation for the lift 4.35 H is not necessary. But it is necessary to
dowel the columns at 4 points and to safe the lift against slipping. For this a concrete floor
without reinforcement, thickness of 160 mm and quality B 25 is needed. In case of doubt
a test drill is necessary and a dowel is to put in. Afterwards the Liebig-dowel (German
Dowelmanufacturer) is to fasten with a torque of 50 Nm. If the necessary torque is too
low or if there are cracks in the concrete floor, a foundation in accordance with the sheet
"foundation plan" is to erected. As well it must be paid attention that the installation place
is even to guarantee a horizontal erection of the lift.
• Put runways on two erection trestles at installation place, pay attention of exactly
difference between the runways (refer to data sheet)
• Position the Traverses on the face of the runways, and put the plugs together.
• Mount the ropes (see pic. 3)
• Position columns at ends of traverses
• Line up the operating column (with bubble level) and drill holes for dowel-fixing
through four bore-holes of base plates. Clean bore-holes with pressure air. Put in
safety dowels with washers in borings.
• Take carrying ropes through columns to upper side and fix them in the head plate.
• Check the position of the lift and the position of the operating columns again.