Each Liebig-dowel must be tightened with a torque of 50 Nm. Otherwise
the normal function of the lift cannnot be guaranteed.
• Mount the ramps and the loading ramp.
• Adjust sliding guidance at traverse (ca. 4-5 mm reciprocating movement between
sliding guidance and column)
• Adjust regular height of the rails at all of the four columns by moving the nuts,
which fix the carrying ropes in the head plate. For demanded measuring accuracy of
all important vehicle manufacturer it is necessary to install the lift very exactly and
to line it up. For this to the following points should be paid attention.
• Lift the automotive lift to eye level and set it down in ratchet (refer to operating
instructions).
• Position each of the measuring scales on the traverse and check niveau of the two
rails (if they have got the same level) with land leveler.
• Adjust the rails with the screw of the ratchet-rod (on the "head-plate" at the top of
the column.
Adjustable the rail
The standard measure between the rails are 950 mm. Its possible to adjust the rails +/- 100
mm (see the datasheet).
Lower the lift in the ratchtes until there is no tractive power on the ropes werden.
• Lower the main lift in the ratchet
• Remove the ramp and the roll-off of the rail (only the adjustable rail)
• Remove both cover of the traverse.
• Remove the screws and if necessary position supports under the rail
• Adjust the rail.
• Tighten the screw .
• Mount the cover.
• Mount the ramp and the roll-off saftey
• Raise the lift out of the ratchets.
Instruction and Documentation