Setup; Installing The Boom - Toro TXL 2000 Operator's Manual

Trencher head tool carrier
Hide thumbs Also See for TXL 2000:
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
1

Installing the Boom

Parts needed for this procedure:
1
Boom assembly (sold separately)
Procedure
1.
Install the trencher to the traction unit; refer to
the Operator's Manual for the traction unit.
2.
Raise the trencher about 15 cm (6 inches) off
the ground.
3.
Shut off the engine and remove the key.
4.
Remove the jam nuts and tensioning bolt on
each side of the boom
5.
Thread 2 jam nuts onto each bolt to the head
of the bolt.
6.
Insert the bolts into the tubes, with the head of
the bolt and nuts facing the end to be installed
on the drive head
7.
Slide the boom over the arm on the drive head
(Figure
3).
Description
Boom assembly (sold separately)
Digging chain (sold separately)
Crumber (provided with boom)
No parts required
(Figure
3).
(Figure
3).
Qty.
1
Install the boom.
1
Install the digging chain.
1
Install the crumber
Install the spoils auger.
1. Boom
2. Arm
6
Use
Figure 3
3. Tensioning bolt (2)
4. Jam nut (4)
g280085

Advertisement

Table of Contents
loading

This manual is also suitable for:

22533

Table of Contents