Assembly Procedure - ABB Power2 800-M Assembly Instructions Manual

Hide thumbs Also See for Power2 800-M:
Table of Contents

Advertisement

Assembly Instructions / Power2 850-M
5 Installing the high-pressure stage / 5.2 Assembly procedure
5.2

Assembly procedure

CAUTION
Air suction branch with bellows installed
If the high-pressure stage is transported with the air suction branch and bel-
lows installed, the bellows may be damaged.
Transport and put down air suction branch together with bellows separ-
u
ately.
Fig. 8: Installing the high-pressure stage
Attach one lifting gear to the two suspension points of the bearing casing and one lifting
u
gear to the support.
Check that the orifices specified for the high-pressure stage have been installed in both
u
oil supply pipes.
Check that the gaskets have been correctly fitted at the oil inlet and the oil outlet in the
u
bracket.
Check that the sleeves of the bearing casing fixing screws have been correctly fitted.
u
Align the high-pressure stage on the engine.
u
Tighten fixing elements at foot and support
u
→14).
Connect the cable connector to the speed sensor.
u
Install air suction branch together with bellows.
u
Secure all gas, air, water and oil pipes.
u
© Copyright 2019 ABB. All rights reserved.
(see Table 11: Fixing element requirements
HZTL455311P0010_EN
Revision A
March 2019

Advertisement

Table of Contents
loading

Table of Contents