Appendix H Installation Checkout Using The Ifr-6000 Ramp Test Set; Introduction; Controls; Checkout Procedure - L-3 Communications SKYWATCH HP SKY899 Series Installation Manual

Traffic alert/advisory system
Table of Contents

Advertisement

Using the IFR-6000 Ramp Test Set
H.1 INTRODUCTION
This appendix contains checkout procedures that will validate the installation and return to service of the
SKY899 installed with WX-1000 display using the IFR-6000 shown in Figure H-1.
Each time the TRC, directional antenna, or directional antenna cables
(including connectors) are installed, removed or replaced, the TRC must
be calibrated to the directional antenna (refer to paragraph H.3).
1. This procedure assumes familiarity with the set up and operation of
the TCAS ramp test set.
2. All test equipment used in completing these tests shall be calibrated
in accordance with the manufacturer's recommendations.
3. A five minute warm-up period is required for the IFR-6000.
4. When the SKY899 is interfaced to an alternate display, reference Appendix F while
performing this checkout procedure.

Figure H-1: IFR-6000 Test Set with Directional Antenna Attached

H.2 CONTROLS
All operating controls are located on the IFR-6000. Figure H-1 shows the locations of the button controls
and directional antenna. Complete operating instructions for the IFR-6000 are provided in the IFR-6000
operation manual.
009-11900-001
Revision F
The document reference is online, please check the correspondence between the online documentation and the printed version.
SKY899
Installation Manual
Appendix H
Installation Checkout
CAUTION
NOTES
Appendix H - Page H-1
July 18, 2013

Advertisement

Table of Contents
loading

This manual is also suitable for:

Skywatch hp sky899a805-11900-001

Table of Contents