Putting Into Operation - Waldmann ATARO DUW 2/D Series Instructions For Use Manual

Wall mounted uplighter
Table of Contents

Advertisement

Available languages

Available languages

Instructions For Use Wall Mounted Uplighter DUW 2xx(D) "ATARO"
ENG
Putting into operation
Fig. 30
NOTICE
Damage caused by wrong
mains voltage!
A wrong mains voltage may dam-
age or destroy the light.
¾ Before putting the light into
operation, check whether the
mains voltage is identical to the
rated voltage specified on the
rating plate!
Inserting the lamps
(if not yet inserted)
See Fig. 30.
Insert the new lamp from above on
both sides into the socket slots [a]
and turn the lamp by 90° [b].
Note!
Use only lamp types approved by
the manufacturer (see "Technical
data").
Information for
dimmable lights
(DUW 2xx/D)
To avoid flickering of new (not
burned-in) fluorescent lamps, first
use them for some time (approx.
100 h) in undimmed condition
(see information provided by the
manufacturer). Operating the light
in undimmed condition and without
light control during the first days
or weeks results in an increased
brightness and in maximum use-
ful life.
35

Advertisement

Table of Contents
loading

Table of Contents