Cleaning Preserving Agent When Starting-Up Of Operation Initially; Ventilate Unit (Hydraulic System) If The Sound Of Inlet Valve Is Not Audible; Taking The Unit Into Operation With Coating Material - WAGNER SUPER FINISH 33 PRO Operating Manual

Hide thumbs Also See for SUPER FINISH 33 PRO:
Table of Contents

Advertisement

Super Finish 33 PRO
4.5
CLEANING PRESERVING AGENT WHEN
STARTING-UP OF OPERATION INITIALLY
Unit with suction tube
1. Immerse the suction system into a container filled with a
suitable cleaning agent (recommendation: water).
Unit with hopper
2. Fill up hopper with a suitable cleaning agent (recommen-
dation: water).
3. Open the relief valve (2), valve setting
4. Switch on the device.
5. Turn the pressure regulating knob (1) to the right until
the stop is reached.
6. Wait until cleaning agent is emitted from the return hose.
7. Turn the pressure regulating knob (1) back approx. one
rotation.
8. Close the relief valve (2), valve setting
Pressure is rising up inside the high pressure hose (visible
at pressure gauge)
9. Point the tip of the spray gun into an open collecting con-
tainer and pull the trigger guard at the spray gun.
10. The pressure is increased by turning the pressure regulat-
ing knob (1) to the right. Set approx. 10 MPa (100 bar) at
the pressure gauge.
11. Spray the cleaning agent out of the unit for approx.
1 - 2 min. (~5 litres) into the open collecting container.
4.6
VENTILATE UNIT (HYDRAULIC SYSTEM) IF THE
SOUND OF INLET VALVE IS NOT AUDIBLE
1. Switch on the unit.
2. Turn pressure regulating knob (1) three revolutions to
the left.
3. Open the relief valve (2), valve setting
The hydraulic system is ventilated. Leave the unit on for
two to three minutes.
4. Then turn pressure regulating knob (1) to the right until
stop.
5. Press inlet valve pusher (4).
Sound of the inlet valve is audible.
6. If not, repeat points 2 to 4 or tap gently with a small ham-
mer on the flat of the outlet valve.
(circulation).
2
(spraying).
4.7
Unit with suction tube
1. Immerse the suction system into a container filled with
coating material.
Unit with hopper
2. Fill coating material into the hopper.
(circulation).
3. Press inlet valve pusher (4) several times to release pos-
sibly clogged inlet valve
4. Open the relief valve (2), valve setting
the unit will start.
5. Turn the pressure regulating knob (1) to the right until
the stop is reached.
When the noise of the valves changes, the unit is bled and
takes in coating material.
6. If coating material exits from the return hose, turn the
pressure regulating knob (1) back approx. 1 rotation.
7. Close the relief valve (2), valve setting
Pressure is rising up inside the high pressure hose (visible
at pressure gauge (3)).
8. Pull of the spray gun and spray into an open collecting
container in order to remove the remaining cleaning
agent from the unit. When coating materials exits from
the tip, close the spray gun.
9. Adjust the spraying pressure by turning the pressure reg-
ulating knob (1).
10. The unit is ready to spray.
TAKING THE UNIT INTO OPERATION WITH
COATING MATERIAL
GB
STARTUP
4
3
1
(circulation);
(spraying).
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

D702c

Table of Contents