Page 2
Greenhouse Assembly Instructions IMPORTANT You must read these instructions carefully before you start to assemble this greenhouse. Please ensure that you find all parts in the carton box in the correct type and quantity as mentioned in the list illustrated in every page accordingly.
Page 3
SAFETY ADVICE We strongly recommend the use of work gloves during assembly. Do not attempt to assemble the greenhouse in windy or wet conditions, Do not touch overhead power cables with the aluminum profiles. Always wear shoes and safety goggles when working with extruded aluminum.
Page 6
"hexagonalscrew" installation Place the "hexagonalscrew" into the groove, turn clock wise untilits to turning. Adjust the "hexagonalscrew" by hand and twist threads fix it in place. Place other partson "hexagonalscrew" and assemble nut. PART NO. Qty.
Page 7
F4(2PCS) PART NO. Qty. F4(2PCS) F4(2PCS) F4(2PCS) F4(2PCS)
Need help?
Do you have a question about the GH117000 and is the answer not in the manual?
Questions and answers