Page 2
- ASSEMBLING THE ROOF STRUCTURE (fig. A). Components A - Mount the ridges of the roof. To mount the front and rear ridge use the Pos.01 3-way joint while to mount the Description Pos. Cod. Q.ty central ridges use the Pos.02 4-way joint, fit the 104 cm long tubulars (Pos.03) into the slanted slots of the joints 1685 3-way joint...
- ASSEMBLY OF THE COLUMNS ON THE GROUND (fig. B). A - Position the roof obtained in the point where you intend to assemble the greenhouse, having first flattened the ground or in the case of grassy ground after performing a very low grass cut.
- ASSEMBLY OF THE DOWELS ON THE FLOOR (fig. C). A - Position the roof obtained in the point where you intend to mount it (fig.C). B - Contour the joints with a marker or other tracer means (fig.C1) to outline the position where to fix the bases Pos.10;...
Page 5
- INSTALL THE VERTICAL TUBES (fig. D). A - Insert the tubulars Pos.05 in the bases Pos.10. B - Then assemble the frame-roof by inserting the joints of the same into the vertical tubulars. fig. D...
Page 6
- COMPLETE THE ASSEMBLY OF THE STRUCTURE (fig. E). A - Mount the roof over the vertical tubulars Pos.05 so as to obtain the complete structure. B - After assembly, check the external dimensions with those of the drawing. It is important that the dimensions correspond to ensure correct assembly of the fabric. fig.
Page 7
- MOUNTING THE SHEET (fig. F). A - Open the sheet zips and then drag the sheet Pos.06 on the structure starting from one side of the greenhouse as shown in the figure. fig. F...
Page 8
- ASSEMBLY OF THE SHEET (fig. G). A - Once the cap has been inserted, close the zips and arrange the sheet carefully. B - Use the stakes Pos.07 to fix the sheet on the ground. C - Cover the protruding part of the sheet with the soil making sure it is well stretched. (C) Cover with soil (B) Close the zips the abundant sheet...
Page 9
- ASSEMBLY OF THE SHADING NET (fig. H). To keep the cultivated products longer, the greenhouse has been equipped with a shading net that must be fixed under the roof of the greenhouse with the appropriate plastic clips also supplied. A - Insert the shading net Pos.08 between the greenhouse sheet and the roof tubulars and fix it to the eaves tubular with the clips Pos.09.
Page 10
Contact information Head office: Dancover A/S For more information Nordre Strandvej 119 G please visit: 3150 Hellebæk www.dancovershop.com Denmark National contact Denmark: 70 26 76 20 Spain: 911 436 828 denmark@dancover.com espana@dancover.com UK: 020 8099 7570 Italy: 02 479 21 198 uk@dancover.com...
Need help?
Do you have a question about the GH16060 and is the answer not in the manual?
Questions and answers