Download Print this page
Eaton MEMSHIELD 4 Installation Instructions

Eaton MEMSHIELD 4 Installation Instructions

Earth leakage modules

Advertisement

Quick Links

MEMSHIELD 4 INSTALLATION INSTRUCTIONS FOR
EM4PBKEL404/EM4PBKEL804 EARTH LEAKAGE MODULES
Instruction leaflet LT1227 (01/19)
IMPORTANT NOTES
1. This product should be installed, commissioned and maintained by or under the supervision of a competent electrician in
accordance with current electrical engineering Codes of Practice, Requirements for the Electrical Installations (IET Wiring
Regulations BS7671), Construction (Design and Management) Regulations, HSG150 - Health and Safety in Construction, Statutory
requirements and any Specific instruction issued by the Company.
2. After completing the installation and testing of this product it is essential that this leaflet is drawn to the attention of the
person responsible for its future operation and maintenance, and is at all times available for ready reference.
3. These notes assume throughout that the product is disconnected from the supply. It is essential that this is done before any
work is carried out.
4. These Panelboards are only designed for use with Eaton MCCBs. Failure to comply will result in invalid warranty and
certification.
Items supplied with Earth Leakage Modules
M8 x 16mm long screw
M8 Hexagon Nut/washer
M6 x 16mm long screw
M6 Hexagon Nut
M6 External Tooth Washer
M5 x 8mm self tapping screw
Cable Ties
Cable Tie Bases
Earth Leakage Module assembly instructions
1. Align the Module to the bottom of the Panelboard and fix together with provided screws: 4 x M6 screws and nuts; 8 x external
tooth washers on either side of the joint to break the paint for earth continuity.
2. Fit the Shunt Trip provided to the incoming MCCB.
3. Fit the terminal block assembly (Fig.1) to the Panelboard. Using the DIN rail as template, mark the position of the 2 fixing
holes. Drill 2 x 4.3mm dia holes and secure the terminal block assembly using the M5 x 8mm screws provided.
Fig.1 Terminal Block Assembly
2 Qty
2 Qty
4 Qty
4 Qty
8 Qty
2 Qty
12 Qty
4 Qty
2.5mm² Double Insulated Grey/Brown) Cable
2.5mm² Double Insulated Grey/Blue Cable
2.5mm² Cable Ferrules
2.5mm² x M8 Ring Connector
1.5mm² Grey Cable
1.5mm² Cable Ferrules
Shunt Trip
2.8 metres
2.8 metres
2 Qty
2 Qty
2 metres
6 Qty
1 Qty

Advertisement

loading

Summary of Contents for Eaton MEMSHIELD 4

  • Page 1 3. These notes assume throughout that the product is disconnected from the supply. It is essential that this is done before any work is carried out. 4. These Panelboards are only designed for use with Eaton MCCBs. Failure to comply will result in invalid warranty and certification.
  • Page 2 Intellectual Property Rights control. Particular care should therefore be taken to follow the instructions Eaton wishes to make it clear that it owns intellectual property rights in the given here and to ensure their continued availability in conjunction with the product which it manufactures (whether or not listed in this leaflet) and that it use of the product.

This manual is also suitable for:

Em4pbkel404Em4pbkel804