Download Print this page

Festo SMEO-2 Series Operating Instructions Manual page 4

Electrical reed switch

Advertisement

3.2 Strap
The switch is
der by means of a stainless-steel strap.
The minimum distances of 4 mm must be
maintained in all cases.
1. Cut strap to length and insert in slide ring.
2. Screw slide ring into housing until the strap
is secured (2 to 3 turns of the thread).
3. Place the strap around the cylinder barrel,
insert it into the pin of the clamping bracket
and secure it on the housing.
4. Place clamping bracket on mounting rail,
adjust it and tighten the securing screws.
of the slide ring until the reed switch is
reliably secured.
3.3 Minimum distance between reed
switches
This is defined by the minimum distance of
60 mm between the outer walls of 2 cylinders.
secured to thecylin-
3.2 Spannband
Spannband
Die Abstandevon 4 mm sind unbedingt einzu-
1. Spannband ablangen und in Gleitstein ein-
2. Gleitstein so weit in das Gehause ein-
schrauben, bis das Spannband gesichert
ist (2 bis 3 Gewindegange).
in den Stift des Klemmwinkels einhangen
und am Gehause befestigen.
4. Klemmwinkel auf der Befestigungsstange
aufsetzen, justieren und Befestigungs-
schrauben anziehen
5. Spannband mit der Spannschraube des
Gleitsteins nachziehen bis zur sicheren Be-
festigung des Naherungsschalters.
3.3 Mindestabstand von
Dieser ist festgelegt durch den Mindestab-
stand von 60 mm zwischen 2 Zylinderaufjen-
wandungen.

Advertisement

loading

This manual is also suitable for:

Smeo-2-led-24