White Rodgers 1F95-80 Operation Manual page 17

7 day multi-stage electronic digital thermostat with programmable fan
Table of Contents

Advertisement

5 minutes between cooling cycles. The
following may cause a time delay in COOL:
a) Return of power after a power outage.
SYSTEM
b) Pressing
SWITCH
modes.
c) Pressing
for COOL too soon after a previous call.
• SYSTEM INDICATOR LIGHTS — The red
indicator light comes on whenever the heat-
ing or cooling system is operating. The
yellow indicator light comes on when the
second stage of heating or cooling is oper-
ating.
• TOTAL KEYPAD LOCKOUT — When
option switch #4 is in the total keypad
lockout position (ON), programs cannot be
altered and all buttons are disabled.
to change operating
or
, creating a call
Programming should be completed and bat-
tery should be installed before changing option
switch #4.
TOTAL KEYPAD LOCKOUT (ON)
ON
Switch #1 set at installation (DO NOT CHANGE)
Switch #2 set at installation (DO NOT CHANGE)
Switch #3 (see EMR)
Switch #4 ON
Switches #1 and #2 are set at installation
and should not be changed. To enable total
keypad lockout, move option switch #4 to
ON. To disable total keypad lockout, move
option switch #4 to OFF.
NOTE
1
2
3
4
17

Advertisement

Table of Contents
loading

Table of Contents