Honeywell HON 5020 User And Maintenance Manual page 83

Gas pressure regulator with hon 630 pilot
Hide thumbs Also See for HON 5020:
Table of Contents

Advertisement

Cleaning
Tightening torques
Maintaining the load
limiting stage
HON 5020 gas pressure regulator with HON 630 pilot
Observe the following cleaning instructions:
 Before assembly, all parts must be cleaned in order to remove any foreign particles
(swarf) and soiling.
 If screws, bolts, or washers are replaced with identical new parts, any oil on these new
parts must first be removed.
When tightening fasteners, observe the following tightening torques:
Part
Socket cap screw
Proceed as follows:
Figure
Tightening torque
12 Nm (9 ft lbs)
Step
Description
1 - 27
Same as in Maintaining the control stage
with a diaphragm assembly (see page 56)
28
Turn the load limiting stage. Unscrew the
socket cap screws and washers on the base
plate
29
Remove the base plate. Replace the O-ring
(1) with a new, greased O-ring.
30
Remove the cotter pin (1) from the cap
nut.
Maintenance
Step
35
83

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents