Step
Description
5
Before connecting the carrier gas line(s) to Micro GC Fusion, assemble the carrier gas line(s)
and purge them for 10 to 30 seconds at low pressure (5 – 10 psi) in order to remove air from the
regulator and carrier gas line(s). Assemble in the following order: 1) regulator,
2) traps, 3) tubing and 4) particulate filter.
CAUTION
Gas cylinders present a hazard when not secured properly.
Securely fasten all compressed gas cylinders to an immovable
structure or permanent wall. Store and handle compressed
gases in accordance with safety procedures.
WARNING
Wear eye protection when using compressed gas.
Micro GC Fusion - Quick Start Guide
Carrier Gas Tank
Carrier Gas Filter
2
Need help?
Do you have a question about the Micro GC Fusion and is the answer not in the manual?