Locating the Boiler

!
WARNING
Failure to observe the following location
requirements could result in a fire, explosion or
carbon monoxide (CO) hazard.
A. Clearances:
Provide clearance between boiler jacket
and combustible material in accordance with
local fire ordinances. Observe minimum
clearances shown in Figure 4.1 to avoid
potential fire hazard. Except as noted, these
clearances apply to all combustible
construction as well as noncombustible walls,
ceilings and doors.
Front - 4"
Left Side - 4" (1" if location of safety relief
valve is on right side of boiler - Figure 7.2)
Right Side - 4" (1" if location of safety relief
valve is on left side of boiler - Figure 7.1)
Rear - 1"
Top (Closet installation) - 18"
Top (Alcove installation) - 4"
109836-01 - 04/20
Figure 4.1: Minimum Clearances To Combustible Construction
Provide practical service clearances. A 24"
service clearance from the jacket is
recommended on the left, right, and front
of the boiler. These clearances may be
reduced to those shown in Figure 4.1,
however servicing the boiler will become
increasingly difficult as these service clear-
ances are reduced.
B. Provide a minimum clearance of 1/2" from hot
water pipes to combustible material.
C. Do not install this boiler in a location where
gasoline or other flammable vapors or liquids,
or sources of hydrocarbons (i.e. bleaches,
cleaners, chemicals, sprays, paint removers,
fabric softeners, etc.) are used or stored.
D. Do not install this boiler in an area where large
amounts of airborne dust will be present, such as
a workshop.
E. The boiler must be installed on a hard level
surface. This surface may be combustible.