Figure 25. Compute enclosure thumbscrews
Step 13. Insert back into the enclosure the shuttle and all the previously removed compute nodes.
The installation of the compute block in a rack is now complete.
54
Lenovo ThinkAgile CP Storage Capacity Upgrade Guide