Lenovo ThinkAgile CP Series Upgrade Manual page 53

Storage capacity
Hide thumbs Also See for ThinkAgile CP Series:
Table of Contents

Advertisement

Step 5.
On each side of the storage enclosure, fit the hook on the top of the side cover and push the
bottom of it inward to reinstall the side cover to the storage enclosure.
Figure 16. Reinstalling the side cover
The installation of the storage block in a rack is now complete.
.