Best Practices for AC Power Connections

Procedure A: Working with the customer's electrician onsite

Use this procedure if the customer's electrician is available at the installation site.
This procedure requires three basic tasks that alternate between the customer's electrician, the
Dell EMC CE and back to the customer's electrician.
l
l
l
Dell EMC
VMAX3
90
Task 1: Customer's electrician
Task 2: Dell EMC Customer Engineer (CE)
Task 3: Customer's electrician
Family Site Planning Guide VMAX 100K, VMAX 200K, and VMAX 400K