INSTALLATION PROCESS

Indicate clearly who will be responsible for switch setting.
Determination of division work
Make connection clearly between outdoor, indoor,
Preparation of contract drawings
remote controller and option.
Take account of gradient
Sleeve and insert work
of drain piping
Check model name to
Installation of indoor unit
make sure the fitting
is made correctly
Special attention to dryness,
Refrigerant piping work
cleanness and tightness
Drain pipe work
Adjust to downward gradient
Make sure airflow is sufficient
Duct work
Make sure no gaps are left where
Heat insulation work
the insulating materials are joined
Electrical work
Multiple core cable must not be used.
(connection circuits and drive circuits)
(suitable cable should be selected)
In the final check for 24hours at 3.8 MPa(38.7 kgf/cm
Airtight test
must be no drop in pressure.
The vacuum pump used must have a capacity of reaching at least
Vacuum drying
5 torr, more than 1 hour
Recharge correctly as calculated in this manual. and record the
Additional charge of refrigerant
amount of added refrigerant
Make sure there are no gaps left between the facing materials
Fit facing panels
used on the ceiling
Automatic addressing and
Refer to automatic addressing flowchart
pipe dection of indoor unit
Preheat the compress for more than 6 hours.
Run each indoor unit in turn to make sure the pipe work
Test run adjustment
has been fitted correctly
Explain the use of the system as clearly as possible to your customer and
Transfer to customer with explanation
make sure all relevant documentation is in order
!
CAUTION
• The above list indicates the order in which the individual work opera-
tions are normally carried out but this order may be varied where
local conditions warrants such change.
• The thickness of the piping should comply with the relevant local
and national regulations for the designed pressure 3.8MPa(551.1psi).
• Since R410A is a mixed refrigerant, the required additional
refrigerant must be charged in its liquid state.(If the refrigerant is
charged in its gaseous state, its composition changes and the sys-
tem will not work properly.)

OUTDOOR UNITS INFORMATION

• Ratio of the connectable Indoor Units to the Outdoor: 50 ~ 160%
• Ratio of running Indoor Units to the Outdoor: 10 ~ 100%
• A combination operation over 100% cause to reduce each indoor
Outdoor unit foundation work
The foundation must be level even
Installation of outdoor unit
Avoid short circuits and ensure
sufficient space is allowed for service
2
) there
!
CAUTION
unit capacity.