Pre-Commissioning Procedures - RC GROUP TRIPACK Series Installation, Use And Maintenance Manual

Multifunction chillers
Table of Contents

Advertisement

Chapter 4 - INSTALLATION AND TESTING INFORMATION
ELECTRIC BOARD INLETS / OUTLETS
INLETS
OUTLETS

4.11 PRE-COMMISSIONING PROCEDURES

Before contacting the specialized Engineer who will execute the
commissioning for testing, the Installer must carefully check that the
installation conforms to the requirements and specifications laid-down
during the design stage, making sure:
that the electrical connection is correct;
-
-
that the hydraulic connection is ended correctly;
that the plumbing is filled with liquid under pressure;
-
-
that pumping systems are working;
that all shutoff valves are open.
-
28
Power supply 400/3/50+N
Working mode selector Summer / Winter
Working mode enabling Summer / Winter
Domestic water enabling
Chilled / hot water flow switch
Domestic water flow switch
General alarm 2
General alarm 1
RC GROUP S.p.A I_TRP_0909_GB