Chapter 4 - INSTALLATION AND TESTING INFORMATION
During the design stage, the installation of the following components in
the water supply line must be contemplated.
Shutoff valve: for the hydraulic insulation of the heat exchanger
-
from the plant during maintenance.
Vibration damper: dampers the vibration that can transmits to
-
the plant.
Pressure gauge (with stop valve): indicates the water pressure
-
in the inlet line.
Thermometer: indicates the water temperature in the inlet line.
-
Air vent: removes the air from the inlet line.
-
Pipe's draining valve: drains the water from the plant. To be
-
used also for connecting an external pump for the chemical
wash.
Gauze filter: separates the impurities from the water.
-
Install the following components in the water outlet line.
Water flow meter: measures the water flow in the plant.
-
Pipe's draining valve: drains the water from the plant. To be
-
used also for connecting an external pump for the chemical
wash.
-
Air vent: removes the air from the outlet line.
Thermometer: indicates the water temperature in the outlet line.
-
-
Pressure gauge (with stop valve): indicates the water pressure
in the outlet line.
-
Vibration damper: dampers the vibration that can transmits to
the plant.
-
Calibration valve: calibrates the water flow.
Shutoff valve: for the hydraulic insulation of the heat exchanger
-
from the plant during maintenance.
Install an expansion tanks with safety valve in the heat exchanger
circuit.
Its size must be designed and implemented according to the applicable
laws.