Installation Of Zb-S 26, 18, 18C6, 10C, 10C6 In The Ebr-S-2050 Electrical Service Room; Technical Data - Eaton ZB-S Series Installation Instructions Manual

Central battery system in electrical service rooms ebr-s
Hide thumbs Also See for ZB-S Series:
Table of Contents

Advertisement

14 Installation of ZB-S 26, 18, 18C6, 10C, 10C6 in the EBR-S-2050 electrical service room

14 Installation of ZB-S 26, 18, 18C6, 10C, 10C6
in the EBR-S-2050 electrical service room
1. Align the system and screw-fasten to the rear wall of
the room.
CAUTION
Holes must be pre-drilled for fastening screws into the
fire protection material. Drill hole depth: max. 25 mm,
screw length: max. 25 mm.
2. Set up the technical ventilation (see the installation and
operating instructions ELECTRICAL SERVICE ROOM
PRIORACK-Elt EBR)
3. Disassemble the roof plate of the ZB-S. Mount the
cable interception system (see the drawing).
4. Feed in the cables.
5. Connect the system in accordance with the CEAG ZB-S
instructions and carry out commissioning of the system.

15 Technical data

Type
Electrical service room including cable barrier
and ventilation barrier.
CEAG part number
Electrical service room including cable barrier
and ventilation barrier. Self-assembly
CEAG part number
Installation of the system in an assembled
room is possible at a later date
Max. airflow [m³/h] acc to. EN50272-2
for boost charge*
Max. heat loss rate [W]*
No. of KRS 125 cable sealings for 26 cables
3 x 2.5 mm² or 10 cables at 3 x 25/16 mm²
Max. no. of 2.5 mm² cables
Max. no. of 25 mm² cables
Dimensions
[H without stand/H with standxWxD; mm]
Weight (approx.) room/system [kg]
Accessories
Maximum number of supplementary KRS 125
cable sealings. Max. 26 cables per cable sealing
3 x 2.5 mm² or 10 cables at 3 x 25/16 mm²
(see figure on page 5)
Plinth with plinth panel, width 1060 mm,
H = 84 mm
CEAG part number
Plinth with plinth panel, width 810 mm
H = 84 mm
CEAG part number
Stop rail, cable infeed incl. fixing material
Mounting plinth for wall cabinets
Door stop, left
* Ventilation for the battery charge and heat dissipation must be provided.
O
8
Manual: ZB-S central battery system in electrical service rooms EBR-S 40071860238 (C) November 2017 www.ceag.de
ZB-S 26 and ZB-S 18 in
ZB-S/26
ZB-S/18
EBR-S-2050
EBR-S-2050
40036071113
40036071113
EBR-S-2050
EBR-S-2050
40036071112
40036071112
no
no
800
700
4
4
78
78
10
10
2417/2501x1144x736 2417/2501x1144x736 2417/2501x1144x736 2417/2501x1144x736
692/180
692/170
6
6
EBR-S-2050-SO
EBR-S-2050-SO
40036071115
40036071115
-
-
-
-
40071361160
40071361160
-
-
No additional costs but 6 weeks of delivery time.
ZB-S 18C6 and ZB-S 10C, 10C6
EBR-S-2050
ZB-S/LAD
Battery cabinet
EBR-S-2050
EBR-S-2050
40036071113
40036071113
EBR-S-2050
EBR-S-2050
40036071112
40036071112
no
no
3.86
600
13
4
4
8
-
10
2
692/170
692/170**
6
6
EBR-S-2050-SO
EBR-S-2050-SO
40036071115
40036071115
-
-
-
-
40071361160
-
-
-
** Without batteries
in EBR-S-2050
ZB-S/10C
EBR-S-2050
40036071113
EBR-S-2050
40036071112
no
2.32
300
4
78
10
2417/2501x1144x736
692/155
6
EBR-S-2050-SO
40036071115
-
-
40071361160
-

Advertisement

Table of Contents
loading

Table of Contents