Installation Instructions - Festo VMPA-ASI-EPL 4E4A-Z Series Brief Description

Mpa valve terminal with as-interface
Hide thumbs Also See for VMPA-ASI-EPL 4E4A-Z Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17
3

Installation instructions

3.1 Mounting the valve terminal
The valve terminal can be fastened in hat rails or mounted
on a wall.
Note
In order to guarantee resistance to shocks and vibra-
tion, the maximum distance between the fastening
points must not exceed 280 mm.
3.2 Replacement of the connection block
The valve terminal uses the exchangeable connections of
the CPX system. Replace the sub-base as follows:
1. Loosen the 4 screws in the sub-base
screwdriver size T10.
2. Pull the sub-base
from the electrical plug connector.
3. Insert the new sub-base. Tighten the 4 screws of the
sub-base (tightening torque of the screws 0.65 Nm
10 %).
±
4. Make the necessary connections. Seal unused connec-
tions with protective caps.
Note
The sub-base CPX-AB-4-M12x2-5POL (-R) must not be
used.
20
1
carefully and without tilting away
Festo P.BE-K-MPA-ASI-4E4A-Z 1109b English
1
with a Torx

Advertisement

Table of Contents
loading

Table of Contents