Harvia sentiotec Concept R black Instructions For Installation And Use Manual page 47

Sauna heater
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 30
Installation instructions, only for experts
Connection of Concept R 12 kW and 15 kW
(CP-RB-120 / CP-RB-150)
1. Guide the connection cable for the sauna control unit through the feed-
through 8.
2. Connect the connectors of this connection cable to the U1 – V1 – W1 – N – PE
terminals on the connector block 9 and to the applicable sauna control unit
terminals. Observe the installation instructions for the sauna control unit when
doing so.
3. Guide the booster cable through the feed-through 7.
4. Connect the connectors of the booster cable to the U2 – V2 – W2 – N – PE
terminals on the connector block 6 and to the applicable booster terminals.
Observe the installation instructions of the booster when doing so.
5. Reattach the cover panel 2 to the heater.
9
8
6 Connector block for the booster
7 Feed-through for the booster cable
8 Connector block for the sauna control unit
9 Feed-through for the connection cable for the sauna control unit
U1
V1
W1
N
PE
p. 19/28
6
U2
V2
W2
N
PE
7
EN

Advertisement

Table of Contents
loading

Table of Contents