Installing Ecovision Ii Plus Canopy Support - Hussmann EcoVision II Plus Door Upgrade Installation & Service Manual

For tyler n6d multi-deck merchandisers
Table of Contents

Advertisement

EcoVision II Plus Door Upgrade Installation Manual
5
Installing EcoVision II Plus Canopy
Support
A. Center the canopy support inside the channel
at the top of the case. Fasten the first screw at
the center of the canopy support. The canopy
support may need to be adjusted later (after the
mullions are installed). Do not tighten canopy
support at this time.
Canopy Support has sharp metal edges.
Wear safety glasses, long sleeve shirt, long
pants, arm guards and gloves. Use caution
when working at eye level or over head.
6
Installing Bottom Rail Support and
Bottom Rail Extrusion
A. Rail supports are installed in 4ft lengths.
Place rail supports on top of existing rail.
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
P/N 0530690_B
5

Advertisement

Table of Contents
loading

Table of Contents