b). On square-holed racks, make sure the prongs are completely inserted into the hole by
confirming that the spring is fully extended.
4. Repeat these steps for the other rail.
5. Secure the rails to the rack using the provided screws.
Install the four screws in the bottom holes of the rack kit.
Do not use the top holes, as those will be used for the captive screw in the chassis.
6. Confirm that the rails have been installed properly.
Both sides are installed on the same rack unit and are horizontal to each other.
The bottom lip is at the same height on all four posts.
The metal clips are properly attached.
Four screws are installed - flat head on the front and pan head on the back.
NVIDIA DGX A100 System
Installing the Rack Mount Kit
DU-10044-001 _v01   |   72