Cisco 7513 Series Replacement Instructions Manual page 4

Chassis replacement
Hide thumbs Also See for 7513 Series:
Table of Contents

Advertisement

Prerequisites
Lifting Safely
A fully configured chassis weighs approximately 160 pounds (72.6 kilograms [kg]). Before
installing the new (replacement) chassis, ensure that your site is properly prepared, so you can avoid
having to move the chassis later to accommodate power sources and network connections.
Preventing Electrostatic Discharge Damage
Electrostatic discharge (ESD) damage, which can occur when electronic boards or components are
handled improperly, can result in complete or intermittent failures. Each processor module consists
of a printed circuit board that is fixed in a metal carrier. EMI shielding, connectors, and a handle are
integral components of the carrier. Handle processor modules by the metal frame or carrier only;
avoid touching the board (particularly avoid touching any components, connector pins, or the metal
fingers on the edge connector).
Following are guidelines for preventing ESD damage:
Caution
should be between 1 and 10 megohms.
4 Cisco 7513 Chassis Replacement Instructions
Never try to lift an object that is too heavy for you to lift safely by yourself.
Ensure that your footing is solid, and balance the weight of the object between your feet.
Lift the object slowly; never move suddenly or twist your body as you lift.
Keep your back straight and lift with your legs, not your back. If you must bend down to lift the
chassis, bend at the knees, not at the waist, to reduce the strain on your lower back muscles.
When lifting the chassis, grasp the underside of the chassis exterior with both hands. Do not
attempt to lift the end of the chassis with the handles on the interface processor carriers; these
handles are not designed to support the weight of the chassis.
Always disconnect all external cables before lifting or moving the chassis.
Always use an ESD wrist strap or ankle strap and ensure that it makes good skin contact.
When removing or installing interface processors, connect the equipment end of the ground strap
to the chassis ground screw on the interface processor end of the chassis.
Place removed processor modules board-side-up on an antistatic mat or in a static shielding bag.
If you are returning a replaced part to the factory, immediately place it in a static shielding bag
to avoid ESD damage to the board.
Avoid contact between the board and clothing. The ESD strap only protects the board from ESD
voltages on the body; ESD voltages on clothing can still cause damage.
For safety, periodically check the resistance value of the antistatic strap. The measurement

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chas-7513-dc seriesChas-7513-ac seriesMas-7513 series

Table of Contents