Download Print this page

Setra Systems SS-SPM Quick Start Manual

Power meter

Advertisement

Quick Links

3/12 Load
48 Load
Remove meter from box
CT connector kit
This quick-start guide provides an overview of the safety and installation requirements for the Setra Power Meter product family. Please refer to the full installation and operation manual for details on all features of the meter.
Safety Information
Denotes warning or caution. See manual for a description of
the meanings.
DENOTES HIGH VOLTAGE. RISK OF ELECTRICAL SHOCK. LIFE
THREATENING VOLTAGES MAY BE PRESENT. QUALIFIED
PERSONNEL ONLY.
Equipment protected throughout by double insulation (IEC
536 Class II).
Contains additional information pertinent to current subject.
Power Meter Quick Start Guide
Preparing for Install
 
Flip open dust cover
Pull front cover forward
Pull down on tabs
What's in the box
Mounting screws
Wall anchors
DO NOT EXCEED 347V Line to Neutral or 600V Line to Line. This meter is equipped to monitor loads up
to 347V L-N. Exceeding this voltage will cause damage to the meter to the meter and danger to the user.
Always use a Potential Transformer (PT) for voltages in excess of 347V L-N or 600V L-L. The Setra Power
Meters are 600V Over Voltage Category III device.
To avoid electrical shock or fire:
• Review the entire manual before use of the Meter and its accessories.
• Comply with local and national safety codes. Use personal protective equipment to prevent shock and
arc flash injury where hazardous live conductors are exposed.
• Only qualified electrical workers should install this equipment. Such work should be performed only after
reading the full installation and operation manual.
• The equipment must be accessible to authorize personnel only. Equipment must be installed in areas
where access can be restricted.
• If the meter appears damaged or defective or internal fuse brownout, first disconnect all power to the
meter. Then contact Setra technical support for assistance.
Insert screwdriver
Pivot screwdriver up to
into slot
remove main assemble
Cal. Cert.
Cable ties
WARNING

Advertisement

loading
Need help?

Need help?

Do you have a question about the SS-SPM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Setra Systems SS-SPM

  • Page 1 Power Meter Quick Start Guide Preparing for Install   3/12 Load 48 Load Remove meter from box Flip open dust cover Pull front cover forward Insert screwdriver Pivot screwdriver up to into slot remove main assemble Pull down on tabs What’s in the box CT connector kit Mounting screws...
  • Page 2 Installation Overview Prior to installation, the full installation and operation manual are accessible by powering up the meter through USB cable and accessing the help section on the web portal or by visiting www.setra.com CT Input Vin 1 4. Following local electrical 1.
  • Page 3 Configuring the meter Connecting the meter to the PC How the “Halo-dot” works Voltage setup menu This menu allows configuration of the voltage input Click “Halo-dot” Near connector to begin Voltage input setup Voltage input 2 1. Connect meter to USB cable 2.