Commissioning - YASKAWA VIPA System 300S Manual

Hide thumbs Also See for VIPA System 300S:
Table of Contents

Advertisement

Manual VIPA System 300S

Commissioning

Overview
Installation
Configuration in
the master system
Addressing
Transferring your
project
Connecting a
system by means
of PROFIBUS
HB140E - IM - RE_353-1DP01 - Rev. 14/47
• Assemble your PROFIBUS system.
• Configure your master system.
• Adjust a valid address of the PROFIBUS.
• Transfer the configuration into your master.
• Connect the master and slave modules with the PROFIBUS.
• Turn the power supply on.
Assemble your PROFIBUS system with the wanted peripheral modules.
Every PROFIBUS slave coupler has an integrated power supply that has to
be provided with DC 24V. Via the power supply not only the bus coupler is
provided but also the modules connected via backplane bus. Please regard
that the integrated power supply can provide the backplane bus with a max.
of 3.5A.
PROFIBUS and backplane bus are galvanically separated from each other.
Configure your PROFIBUS master in your master system. You can use the
WinNCS of VIPA for this purpose ore the Siemens hardware configurator.
At the PROFIBUS slave modules, you set the PROFIBUS address that you
assigned at project engineering.
Depending on the deployed master, there are different possibilities to
transfer your project to the DP master.
In a system with more than one station all stations are wired in parallel. For
this reason the bus cable must be feed-through uninterrupted.
You should always keep an eye on the correct polarity!
Note!
To prevent reflections and associated communication problems the bus
cable has always to be terminated with its ripple resistor!
Chapter 3 Deployment
3-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vipa im 353-1dp01

Table of Contents