EVERY CALL ACTIVITIES
Purpose
List service activities required on every service call.
PROCEDURE
•
Perform GP 6.10 Internal Inspection.
Perform GP 6.11 External Cleaning.
•
•
Perform GP 6.12 Internal Cleaning
•
Perform GP 6.13 Base Cleaning
Perform GP 6.15 Optical Sensor Cleaning
•
Service Call Procedures
SCHEDULED MAINTENANCE
PROCEDURE
•
Check the number of Bind Cycles and Sheet Cycles in the eWire
Settings. Refer to GP 6.2.7.
Refer to the eWire Maintenance Schedule on Page 1-5. Perform all
•
scheduled maintenance.
Replace wear components as indicated in the Periodic Maintenance
•
section of this document.
07/23/2020
1-4
GBC StreamWire