Reference Manual
00809-0100-3389
2
Install
2.1
Unpacking and inspection
Procedure
1. Inspect the outside of the carton for any damage.
2. If damage is detected, contact the carrier immediately.
3. Inspect the hardware.
4. Make sure all the items in the packing list are present and in good condition.
5. Notify the factory if any part is missing.
2.2
Mounting
The sensor has been designed to be located in industrial process environments.
Temperature and pressure limitations must not be exceeded at any time. A label regarding
this matter is attached to the sensor with the cable and should not be removed.
Figure 2-1: Rosemount 389 Sensor Dimensional Drawing
A. pH/ORP electrode
B. TC
C. 1-in. MNPT
D. 1-in. wrench opening
E. 1-in. MNPT
Reference Manual
Install
February 2019
11