Chapter 2 Install; Unpacking And Inspection; Mounting - Emerson Rosemount 389 Reference Manual

General purpose ph/orp sensors
Hide thumbs Also See for Rosemount 389:
Table of Contents

Advertisement

Reference Manual
00809-0100-3389
2
Install
2.1

Unpacking and inspection

Procedure
1. Inspect the outside of the carton for any damage.
2. If damage is detected, contact the carrier immediately.
3. Inspect the hardware.
4. Make sure all the items in the packing list are present and in good condition.
5. Notify the factory if any part is missing.
2.2

Mounting

The sensor has been designed to be located in industrial process environments.
Temperature and pressure limitations must not be exceeded at any time. A label regarding
this matter is attached to the sensor with the cable and should not be removed.
Figure 2-1: Rosemount 389 Sensor Dimensional Drawing
A. pH/ORP electrode
B. TC
C. 1-in. MNPT
D. 1-in. wrench opening
E. 1-in. MNPT
Reference Manual
Install
February 2019
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rosemount 389vp

Table of Contents