Download Print this page

John Shearer 6M Airdrill Operator's Manual page 15

Air seeder cultivator. accessories: tyne airseeder, ddo airseeder.

Advertisement

SETTING UP
Congratulations on the purchase of your new Air Drill.
This manual has been prepared to assure the proper setup,
operation and trouble-free service.
After reading this manual, keep it in the carrier provided on the
implement for quick and easy reference should any question
arise concerning operation or service.
Your AIR SEEDER is designed to give maximum service life,
but a routine lubrication and maintenance schedule must be
followed as shown on the lubrication chart (see page 20)
SETTING UP – TRAILED IMPLEMENT
IMPLEMENT LEVELLING "FRONT TO REAR".
Adjust hitch link to level implement "front to rear" at working
position. Extend the link to increase the depth of working of
the rear tynes. Set the Disc Drill with the grain and fertiliser
box support "level" in the working position.
IMPLEMENT
LEVELING
ADJUSTMENT
Set the adjusting screws on each side.
TURNING
Avoid turning sharply with tynes/discs in the ground. Lift the
machine out of the ground at corners and sow headlands
separately to avoid oversowing.
"SIDE
TO
SIDE"
/
DEPTH
SOWING RATES
Select sowing rates as per the sowing chart. N.B. This chart is to
be used as a guide only.
The new AS2400lt air seeder is sowing through the electric
motor. After calibration, the sowing rate is automatically
controlled by the John Shearer App.
Check sowing rate for a reference as follows:
The sowing rate chart is based on an effective wheel rolling
perimeter of 2568mm. That is 649 revolutions of the drive wheel
correspond to 1 hectare.
13 13
05.19M142J3

Advertisement

loading

Related Products for John Shearer 6M Airdrill

This manual is also suitable for:

As2400lt