Check DC Voltage Setting
Accuracy Without Remote
Sense and Voltage
Readback Accuracy
Series 2200 Multichannel Programmable DC Power Supplies Technical Reference
Equipment required
(Item 2) AC Power Source
(Item 3) Electronic Load
(Item 4) DC Voltmeter
For each channel sequentially.
1. Set up the equipment as shown. (See Figure 5.)
NOTE.
Ensure the warm-up criteria has been met as described in the Performance
Verification Conditions.
NOTE.
To assure accurate measurements, the voltmeter must connect as close as
possible to the front panel of the DUT. A solution is to use fork lugs between the
electronic load and the DUT, and banana plugs between the DUT and voltmeter.
An alternative solution is to use fork lugs for both connections at the DUT.
Performance Verification
(Item 5) High current hook up wire (bold line
connections)
(Item 6) Low current hook up wire (fine line
connections)