Hide thumbs Also See for Oas:

Advertisement

Quick Links

P R E - I N S T A L L A T I O N
O A S W A L L - I N T E G R A T E D R 3
5-06-0009
Publication date 2020-02-27

Advertisement

Table of Contents
loading

Summary of Contents for Orbital Systems Oas

  • Page 1 P R E - I N S T A L L A T I O N O A S W A L L - I N T E G R A T E D R 3 5-06-0009 Publication date 2020-02-27...
  • Page 2 All rights reserved. No part of this document may be reproduced or copied in any form or by any means without written permission from Orbital Systems. The English language version of this document contains the original in- structions. All other language versions are translations of the original instructions.
  • Page 3: Table Of Contents

    Pre-installation T A B L E O F C O N T E N T S EU Declaration of Conformity ..................... 1 Safety Instructions ......................2 Safety Messages Description ..................3 Warranty ........................3 Service ......................... 4 Installation Overview ......................5 Product Measurements ....................
  • Page 4 This page is intentionally left blank.
  • Page 5: Eu Declaration Of Conformity

    The product has undergone mandatory or voluntary certification procedures in order to receive the following certifications: KIWA TG 1503 KIWA K100686/01 IAPMO E10059 IAPMO C-11154 IAPMO W-11301 Signed for and on behalf of Orbital Systems AB Place Date Name Position Malmö...
  • Page 6: Safety Instructions

    Oas shower system. ter quality. These instructions are provided to advise WARNING The Oas shower system can be the best practice for the installation. All in- used by children aged 8 years and above and stallations should be completed by Orbital persons with reduced physical, sensory or Systems or Customer.
  • Page 7: Safety Messages Description

    Pre-installation SAFETY MESSAGES DESCRIPTION WARRANTY The Oas shower and its components are DANGER manufactured from high-quality materials Indicates an imminently hazardous and assembled under strict standards. situation which, if not avoided, will result in death or serious injury. Orbital Systems warranty covers defects...
  • Page 8: Service

    Pre-installation SERVICE Orbital Systems and our team of expert staff are available to assist you should you require product advice, experience any problems, need to purchase spare parts or to set up a service visit. Repairs should always be carried out only by Orbital Systems.
  • Page 9: Installation Overview

    Pre-installation I N S T A L L A T I O N O V E R V I E W PRODUCT MEASUREMENTS 575 mm 1266 mm 1266 mm 440 mm 0 mm Ø 75 mm Ø 75 mm 812 mm 145 mm 122 mm OS Head &...
  • Page 10: Prerequisites For Installation

    Pre-installation PREREQUISITES FOR INSTALLATION Electrical Supply Voltage and current rating: 220-240 V~ / 50 Hz / 16 A Residual circuit breaker: One per shower required. Having a rated re- sidual tripping current not exceeding 30 mA Mains supply fixed cord: Min.
  • Page 11: Shower Installation Overview

    Pre-installation SHOWER INSTALLATION OVER- VIEW Drain Unit dimen- HxWxD: 192 x 812 x sions: 184 mm Shower Unit Core Connection to Ø75 mm 2. Core Wall Enclosure drain: 3. Control Dial 4. Shower Head 5. Hand Shower 6. Hand Head Diverter 7.
  • Page 12: Recycling Optimisation Site Suggestion

    Pre-installation RECYCLING OPTIMISATION SITE SUGGESTION Recommended installation A fully enclosed shower space with floor heating is recommended to optimize recircu- lation rates. INFORMATION VALID FOR ALL SHOWER VARIANTS. Picture displaying OS Head & Hand Shower variant.
  • Page 13: Pre-Installation

    Pre-installation P R E - I N S T A L L A T I O N COMPONENT OVERVIEW OS Head & Hand Shower...
  • Page 14: Kit Measurements

    Pre-installation OS Head Shower KIT MEASUREMENTS 538 mm 440 mm 145 mm 452 mm 114 mm 150 mm 812 mm Ø40 mm 184 mm 690 mm 122 mm Ø75 mm NOTICE Use the two 45 degree pipe elbows included in the kit for the drain. A 90 degree elbow will not be applicable.
  • Page 15: Crucial Kit Measurements

    Pre-installation CRUCIAL KIT MEASUREMENTS Finished floor height where it is level. CAUTION Crucial measurement...
  • Page 16: Prepare Shower Area

    Pre-installation PREPARE SHOWER AREA CAUTION Crucial that all noggin pieces are in level and set according to rec- ommended measurements to avoid misalignment in the shower installation. t45 mm 85 mm >180 mm Mark the finished floor height, where it is level (min 180 mm).
  • Page 17 Pre-installation Valid for OS Head & Hand Shower t45 mm 50 mm Ø50 mm Apply wall covering according to local regulations. NOTICE It’s optional which side of the shower the Diverter is placed. Mirror slot in stud and wall cover- ing if needed.
  • Page 18: Install Drain

    Pre-installation INSTALL DRAIN Valid for OS Drain CAUTION Plumbing and electrical installa- tion should be performed ac- cording to local regulations by a licensed professional. IMPORTANT Do not remove the protective cover from the Drain unit until af- ter assembly. Finished floor height where it is level.
  • Page 19 Pre-installation NOTICE Apply lubricant. NOTICE Anchors provided by Customer. Anchor the Drain Piping according to lo- cal regulations.
  • Page 20: Install Diverter Wall Bracket

    Pre-installation INSTALL DIVERTER WALL BRACKET PREPARE OS HEAD SHOWER 2125 mm 1000mm Measure and mark placement of Wall box UNI Push. Countersunk Stainless Steel Screw Finished floor height where it is level. Pan Head Stainless Steel Screw Follow instructions provided in installa- Secure Pipe in slot in stud and anchor tion box for the Wall box UNI Push.
  • Page 21: Prepare 3Rd Party Head Shower

    • When using a third-party diverter, head shower or hand shower, it is recommended to choose products with low counter pres- sure in order to optimise the Oas system performance. Should the combined coun- ter pressure from the diverter and head/...
  • Page 22 Pre-installation NOTICE Make sure the surface adjacent to the Drain Unit is flush with the flange. Min. 2% Form a steep inclination according to lo- cal regulations (min. 2% inclination) to- wards the Drain Unit. Install waterproof membrane according to local regulations. Make sure they cover the metal flanges of the Drain Unit and the Core Wall Enclosure according to membrane supplier recommendation (X).
  • Page 23 Pre-installation Adjust M3 (5.5 mm driver Secure...
  • Page 24: Tiling

    Pre-installation TILING Apply tiles up against the lacquered line on all sides of the flange of the Wall box. Apply mortar up to the sides of the Frame.
  • Page 25 Pre-installation CAUTION NOTICE Do not cut the PEX hoses. They Floor tiles must be level with, or need to stick out for coming in- higher than the Frame. stallation steps. Ø 30 mm Min 8 mm, Max 16 mm Make sure the tiles do not overlap the Grating, allowing it to be removed.
  • Page 26: Pipes & Connections

    Pre-installation PIPES & CONNECTIONS NOTICE Provided by Customer: PEX hose with corrugated sleeve Apply sealant according to local regula- tions. CAUTION The Core shall be connected to the top inlet. CAUTION The Shower Head shall be con- nected to the bottom inlet.
  • Page 27 Pre-installation CAUTION Cut the corrugated sleeve as close as possible to the water Ø 32 mm tight seal. Ø 25 mm Ø 16-20 mm Ø 12 mm Cut the cone depending on the diameter of the hose. Cut the corrugated sleeves. NOTICE Anchors provided by Customer.
  • Page 28: Final Preparations

    Pre-installation FINAL PREPARATIONS NOTICE CAUTION Length might be adjusted de- The shower will not function without pending on the chosen connec- executing above mentioned steps. tor applied later. 100 mm Pre-installation completed. Next step is to install the Shower Unit, Show- Cut the pipes.
  • Page 29 C E R T I F I E D S P A C E T E C H N O L O G Y...

Table of Contents