Installation Procedure; Preparation Of The Instrument Side Connector - Emerson Rosemount 356 Reference Manual

Nuclear connector
Table of Contents

Advertisement

Reference Manual
00809-0100-4856 Rev AE
February 2020
INSTALLATION
PROCEDURE
Preparation of the Instrument
Side Connector
Figure 2-5 – Properly installed cover
and lanyard
Installation consists of preparing the instrument side connector,
installing the instrument side connector onto the transmitter and
making the electrical connections. The procedures for these
operations follow.
Electrical shock can result in death or injury.
Avoid contact with the connector leads and device terminals
When installing the instrument side of the connector onto the housing
of the device, take care to prevent the lead wires from becoming
twisted or from being cut by any potential sharp edges inside the
electronics housing. The same care must be taken when removing
the connector from the device.
Do not connect signal leads to the 'TEST' terminals on the 3152.
Ensure the provided cover remains in place throughout installation to
provide protection from dust, moisture and other foreign materials.
Ensure that lead wires are attached to positive (+) terminal and
negative (-) terminal as intended, and that instrument and field sides
are consistent.
The standard shipping configuration of the 356 instrument side
connector from RNII is shown in Figure 2-5. If the cover has been
removed during handling, reinstall now before installing connector
onto transmitter.
Rosemount 356
WARNING
WARNING
WARNING
IMPORTANT
IMPORTANT
2-5