1. Guide the lead wires through the back of the connector hood.
2. Making sure that the lead wires do not hang up on anything,
screw the connector hood onto the cable gland as shown. Do not
allow the conductor wires to become twisted.
3. Using a 25 mm open-end wrench on the connector housing and a
22 mm open-end wrench on the cable gland, tighten the two
pieces together. Then use an open-end torque wrench to tighten
the cable gland to 22 ft-lb (30 N-m).